27.9 C
Singapore
Friday, July 4, 2025
Ads

TANAH MERAH MRT ENTRANCE FLOODED, CAUSED BY WATER FROM CONSTRUCTION SITE

The entrance at Tanah Merah MRT was flooded on 12 November, with some commuters having difficulties entering and exiting the station.

Advertisements

SMRT’s statement

“On 12 Nov at around 3pm, water from a construction site next to Tanah Merah MRT station caused flooding at the entrance of the station. Our staff worked with cleaners and the construction site workers to clear the water immediately. For the safety of commuters, our staff were also mobilised to guide them away from the affected area.

Train service was not affected.

The water was cleared at around 5pm. We are working with the construction site supervisors to prevent the situation from recurring.”

– Mr Lam Sheau Kai, President Trains, SMRT Trains

Advertisements

@bundabundabunda0 banjir#fyp fyp fyp #howmuchhaveyouchangedchallenge ♬ Allah Allah Aghisna – Nazwa Maulidia
- Advertisement -
- Advertisement -
Latest News

GUY STARTED DATING A “PERFECT” GIRL BUT SHE MAKES HIM SO NERVOUS UNTIL HIS KKJ CAN’T STAND

Last Saturday I met that girl and we were dating since then. Yesterday it was our third date and...
- Advertisement -