30.3 C
Singapore
Saturday, June 10, 2023
Ads

MRT Station Door Bend Inwards 45 Degress, Glass Cracked

untitled1MRT door faulty, no one injured. Glass cracked!

Advertisements

No train svc btwn King Albert Pk DT6 & Sixth Ave DT7 due to platform screen door fault. Free bus rides available at designated bus stops.

MRT said caused by a signalling fault. What do they mean by signalling fault?

The breakdown happened upon the arrival of the Primary School Leaving Examination (PSLE) Science paper, at 8.15am. Affecting student commuting to school.

MOE announce that students that do not make it on time for PSLE will still be given the full duration of the exam.

Advertisements
- Advertisement -
- Advertisement -
Latest News

GIRL FROM “ROUGH” 3RD WORLD COUNTRY ASKS IS IT SAFE TO STAY AT GEYLANG ALONE

Moving to Lor 6 Geylang as a solo femaleHi! I am moving into a studio walk-up apartment as a...
- Advertisement -