27.5 C
Singapore
Friday, July 4, 2025
Ads

TANAH MERAH MRT ENTRANCE FLOODED, CAUSED BY WATER FROM CONSTRUCTION SITE

The entrance at Tanah Merah MRT was flooded on 12 November, with some commuters having difficulties entering and exiting the station.

Advertisements

SMRT’s statement

“On 12 Nov at around 3pm, water from a construction site next to Tanah Merah MRT station caused flooding at the entrance of the station. Our staff worked with cleaners and the construction site workers to clear the water immediately. For the safety of commuters, our staff were also mobilised to guide them away from the affected area.

Train service was not affected.

The water was cleared at around 5pm. We are working with the construction site supervisors to prevent the situation from recurring.”

– Mr Lam Sheau Kai, President Trains, SMRT Trains

Advertisements

@bundabundabunda0 banjir#fyp fyp fyp #howmuchhaveyouchangedchallenge ♬ Allah Allah Aghisna – Nazwa Maulidia
- Advertisement -
- Advertisement -
Latest News

Man Arrested in Katong After Attempting to Flee Police Check, Fake IC Found on him

A routine traffic stop in Katong escalated dramatically when a 49-year-old van driver fled from officers conducting checks, leading...
- Advertisement -